The general aim of the project is to reduce the negative impact of wastewater from the production process of the the cement factory on the chemical and microbiological quality of the Jale River.
Accordingly, the specific objectives of the project are to reduce the pollution of the river Jale with mineral oils, fats, petroleum products and other pollutants from the wastewater of the Lukavac cement factory by 15 milligrams per liter.
- Energy efficiency
- Education